Construction period benefits: less affected by weather, high qualification rate, low rework rate, saving 20% construction period
Cost benefits: saving 30%-60% project cost compared with gravel filling
Low-carbon benefits: using local materials, reducing material transportation and disposal, reducing carbon footprint by 50%
Quality benefits: achieving high-strength, high-water stability, high-durability roads, reducing maintenance work by 70%
Environmental benefits: solid waste utilization, reducing land occupation and supply-demand contradictions, reducing 80% natural resource consumption
Social benefits: comfortable roads, stable roads, long-life roads, 100% life extension